Skip to main content

JYSK

Offices

Administration building in JYSK Distribution Centre Ecser, Hungary

Services

Plot selection, TDD, Outline design, Tender documentation, Site supervision and quality control

Distribution Centre (DC) Ecser is situated close to Budapest and shall provide a base for JYSK shop supply in the region. In addition to Hungary, this distribution centre will also deliver products to JYSK stores in Croatia, Slovenia, and Slovakia.
The plan includes a logistics areas of just over 153000 m2 and an office space of around 4400 m2. All this is located on a 25.6 hectare site.
Тhe administration building is two-storey. On the ground floor general social functions are placed: changing rooms, toilets, canteen, a space for future cooking kitchen. On the first floor are placed traditional offices and meeting rooms, break spaces and reception desk for JYSK Hungary’s local head office and DC Administration. A nice atrium links together the two stories.

Client
JYSK
Size
3700m2
Typology
Offices
Colaborators
Tecton, BetaCons, K-Project, Praya, Technostar
Location
Ecser, Hungary
Status
Completed
2018 - 2022

Related Projects

JYSK — Highly automated Distribution Centre in Lelystad, the Netherlands

JYSK

/
Logistics
Lelystad, the Netherlands
—
2020
—
In progress

JYSK’s 10th distribution centre worldwide — over 161,000 sq.m. of highly automated logistics space with 43 m high-bay warehouses on a 25.6 ha site.

JYSK — JYSK Distribution Centre Bozhurishte, Bulgaria

JYSK

/
Logistics
Bozhurishte, Bulgaria
—
2019
—
Completed

145,000 sq.m. logistics facility designed for high-volume furniture and homeware distribution, integrating automated storage systems with flexible expansion capacity.

JYSK — Highly automated Distribution Centre in Ecser, Hungary

JYSK

/
Logistics
Ecser, Hungary
—
2018 - 2022
—
Completed

Highly automated distribution centre near Budapest supplying JYSK stores in Hungary, Croatia, Slovenia and Slovakia — over 153,000 sq.m. of logistics space, 189 truck docks and 43 m high-bay warehouses on a 25.6 ha site.

Planning a Similar Project?

Tell us about your facility, office or retail rollout — our team will respond within two working days.